Projects

Construction Projects We Have Completed


311th Signal Command (Regional Cyber Center Pacific)

Removal of the old UPS system to include batteries, conductors, and all conduits. The telecom panels shall have existing feeders removed and shall be supplied by the TOSHIBA UPS system. All conductors, conduits, splice, and equipment associated with connecting the telecom panel to the TOSHIBA UPS system shall be new.

CPAR Rating: Exceptional & Outstanding ✅

USAPRAC PAO Studio

Design build. An industry standard video production studio for US Army pacific. The studio includes professional staging and production areas to accommodate three full time staff members in support of the public affairs mission.

CPAR Rating: Exceptional & Outstanding ✅

FIC Parking Light Removal & Installation

Remove existing wall pack light fixtures and install new wall pack LED light fixtures on the exterior of buildings 214 and 230 resulting in complete and usable system.

CPAR Rating: Exceptional & Outstanding ✅

General Repairs (Fort Shafter)

Provides specialized services as needed for repairs, to include, electrical, plumbing, painting, and general remodeling.

Customer Reviews: Exceptional & Outstanding ✅

General Remodeling

Updated conversion from a tub to a walk in shower, providing easy access and a modern feel for our clients.

Customer Reviews: Exceptional & Outstanding ✅

General Repairs

Sea Life Park spall repair.

Customer Reviews: Exceptional & Outstanding ✅